Building regulations drawings are detailed technical plans and specifications showing how proposed building work is intended to meet the relevant Building Regulations. They explain more than planning drawings: they give Building Control and your builder information about construction, insulation, structure, drainage and safety. In 2026, the cost of preparing them depends on the project and what the fee includes; the Building Control application charge is a separate cost.
If you’re planning an extension, loft conversion or major alteration in Colwyn Bay, Llandudno, Conwy, Wrexham, Rhyl, Chester or Malpas, it helps to understand what the drawings cover before you compare quotes.
What do building regulations drawings include?
The drawings and supporting information are prepared for the specific project. A typical package for a house extension or conversion may include:
- Existing and proposed floor plans, elevations and sections
- Construction details for walls, floors, roofs, foundations and connections to the existing house
- Information about insulation, ventilation and moisture control
- Drainage proposals and relevant site information
- Details addressing structural, fire-safety and access requirements
- A written specification setting out materials and construction requirements
Structural calculations may also be needed, for example for a steel beam, altered roof or foundation design. These are usually prepared by a structural engineer and may be charged separately. The right scope depends on the work, so ask whether calculations, specialist reports and revisions are included in your designer’s fee.
How are building regulations drawings different from planning drawings?
Planning drawings show what you propose to build: its appearance, size, layout and relationship to the site. Building regulations drawings go further into how the work is intended to be constructed and how it will address technical requirements.
A planning set is not usually detailed enough for a builder to price every part of the work or for Building Control to assess all the technical information. The two stages have different purposes, and planning permission does not replace Building Regulations approval.
How much do building regulations drawings cost in 2026?
There’s no standard national fee for preparing building regulations drawings. The price depends on the size and complexity of the work, the quality of the existing information, the detail required and whether the service includes a measured survey, submission support or coordination with an engineer.
Because every project is different, the fairest comparison is an itemised quote. Ask each designer to break their fee down by stage — measured survey, existing and proposed drawings, planning work where needed, and building regulations drawings — so you can see exactly what is and isn't included. A well-scoped technical package usually pays for itself in sharper builder pricing and fewer surprises on site.
Building Control charges are separate from the drawing fee. As of 2026, Cheshire West and Chester’s published 2026/27 Full Plans charges, including VAT and the plan and inspection fees, are:
| Domestic project | Published total charge |
|---|---|
| Single-storey extension under 10 m² | £626.58 |
| Single-storey extension, 10–40 m² | £736.32 |
| Single-storey extension, 40–100 m² | £903.88 |
These are specific to Cheshire West and Chester’s schedule, effective from 1 April 2026-not a national tariff. Charges in North Wales are set separately, and a private approver will quote directly. Check the current fee with the relevant authority before submitting. You can review the Cheshire West and Chester 2026/27 fees or the Conwy Building Control application guidance.
For a wider view of construction budgets, see our guides to extension cost per square metre, single-storey extension costs and house extension cost in North Wales.
Which Building Control route should you choose?
For most home projects, you can apply through the local authority or use a private Registered Building Control Approver. Both routes involve checking the work and carrying out inspections; fees and service arrangements differ.
There are two common application types:
- Full Plans: Detailed drawings and supporting information are submitted for checking before work begins. This gives the project team a technical design to refer to. GOV.UK says a decision is normally expected within five weeks, or within two months if you agree to an extension.
- Building Notice: Intended for smaller projects, this route does not provide the same formal approval of detailed plans in advance. Work can generally start two days after submission, but Building Control may request more information during construction.
For extensions, loft conversions and structural alterations, Full Plans is often a practical choice because it allows more of the technical design to be checked before work starts. The right route depends on the project and your circumstances. Read the current GOV.UK guidance on how to apply for Building Regulations approval.
How long do the drawings and approval take?
Allow time for the design and technical information to be prepared before the formal decision period. As a broad 2026 programme guide, a straightforward technical drawing stage may take around two to four weeks once the design and survey information are settled. More complex structural work, specialist input or design changes can extend this.
For a Full Plans application, allow up to five weeks for the decision, or up to two months with your agreement. The process can take longer if information is missing or the plans need revision. Building Control inspections also take place during construction, and the completion certificate follows when the work and required information are satisfactory.
Why do detailed drawings help your builder?
A clear technical package gives builders a more consistent basis for pricing. Without it, different contractors may make different assumptions about foundations, insulation, drainage or structural work, making quotes harder to compare and changes more likely once building begins.
Penrhyn Architecture prepares construction drawings with the builder’s practical requirements in mind, as well as the client’s brief and sustainability considerations. We bring more than 20 years’ experience and extensive on-site project management experience to our work, helping coordinate design information with the people who will build it.
Our Colwyn Heights project in Colwyn Bay is a single-storey side extension to a bungalow, designed to sit alongside the existing home and make the most of its outlook.

We also work on homes with different local and architectural considerations, including this Malpas, Cheshire project, with traditional brick and oak details.

Find out more about our building regulations applications and construction drawing services, which form part of our wider design and build service.
Frequently asked questions
Do I need building regulations drawings for an extension?
Most extensions need to comply with Building Regulations. The drawings and application route depend on the work; a Building Notice does not require the same detailed plans in advance as Full Plans, but technical information may still be needed.
Are Building Regulations drawings included in a planning application?
Not necessarily. Planning drawings and technical drawings have different purposes. Check your designer’s written scope to see whether building regulations drawings are included.
Are Building Control fees included in the drawing fee?
Usually they are separate. Ask for a breakdown showing the designer’s fee, the Building Control charge and any structural engineering or specialist fees.
Can I use a private Building Control provider?
For most projects, you can use the local authority or a private Registered Building Control Approver. Confirm that the provider is registered and ask for a project-specific fee and service details.
What should I send an architect to get a fee estimate?
Share the property address, a brief description of the work, any existing plans, photographs and details of structural changes you have in mind. This helps establish the likely scope and whether a survey or specialist input may be needed.
If you’re planning building work in North Wales or Cheshire and want to understand what drawings and approvals your project may need, you’re welcome to book a free consultation with Penrhyn Architecture. There’s no pressure to proceed.